The 9 Stages of Complex Engineering Projects
About the stages of complex engineering projects, we have shared a 9 part blog series which is quite popular on our website. Therefore, we…
About the stages of complex engineering projects, we have shared a 9 part blog series which is quite popular on our website. Therefore, we…
Handover (and start-up) in a nutshell After pre-commissioning and commissioning are completed, the built facility can be started up (start-up or SU phase). This…
(Pre-)Commissioning in a nutshell The pre-commissioning (or pre-comm) stage of engineering projects is a critical phase that occurs after construction & installation and before…
Construction & Installation in a nutshell The Construction & Installation stage follows after Procurement & Fabrication. Construction and installation involve putting all the various…
Procurement & Fabrication in a nutshell After successful completion of the Detailed Design stage, procurement and fabrication come next. This happens based on the…
Detailed Design in a nutshell The Detailed Design stage follows after the FEED stage (Front-End Engineering Design). The basic design (with typically 12 to…
FEED in a nutshell The FEED or FEE stage (Front-End Engineering Design) – sometimes Basic Engineering, ‘Define’ or ‘FEL-3’ phase – usually follows after…
Pre-FEED in a nutshell The pre-FEED stage (pre-FEED is short for preliminary Front-End Engineering Design) – sometimes referred to as ‘Design Basis’ or ‘FEL-2’…
Conceptual Design in a nutshell The Conceptual Design stage – sometimes ‘Concept Selection’, ‘Conceptual Engineering’ or ‘FEL-1’ (if FEL project planning is used) –…
The feasibility study in a nutshell The feasibility study is the first phase of an engineering project. Its main objective is to determine whether…
When delivering large engineering and construction projects with long lead times, it is important to have insight into the progress of documents and drawings….